Grab overhead crane & gantry crane customized for different wastes handling. Types of waste handling cranes designs are available. Get your custom design.
Yuantai Crane offers material handling solutions for garbage disposal and recovery by leveraging rich industrial expertise and professional crane technology. A variety of cranes are offered by Yuantai Crane for the green energy sector. We can fully customize our services to meet your requirements, offering manual control, semi-automatic, and automatic cranes. We will work with you to find the ideal crane option and efficiently raise the level of safety and output in every part of the factory.
Custom Overhead Crane for Waste incineration
Safety must be integrated into crane design, operation, and maintenance in every work environment and process. Yuantai Crane understands crane customer requirements. The crane's most important feature is its ability to perform the corresponding functions based on the specific use requirements. When dealing with customer needs, our sales and engineering teams consider the layout of the operating area, the placement of spare cranes, and the overall design of the work cycle. Yuantai Crane offers fully automatic waste cranes outfitted with cutting-edge technology to maximize customer ROI.
Important details must be defined to custom your waste handling cranes
Resting area for orange peel grabs
Parking area for Eot cranes.
Length available to roll up the rope-hold carriages
Access point for crane maintenance
Core configuration of grab overhead crane for wast handling
Variable frequency speed control method, so that the crane can operate stably and reliably.
Two overhead crane systems (one for operation, one for spare), which is used to complete the garbage casting, inverted stacks, mixing, moving and breaking materials of garbage incineration power plants. Each overhead crane system has its own independent electrical control system, operating console and HMI display panel, which can provide a manual and semi -automatic control system according to the needs of the user. Hand and automatic switching are convenient and fast.
Smart features of waste handling cranes
With anti -swaying technology, accurate positioning technology, weighing management system, hydraulic scratching side -by -side control technology, fault diagnosis and remote monitoring technology, intelligent garbage material high judgment technology (automatic control), vector variable frequency speed regulation control Technology, PLC control technology, CMS intelligent remote control technology, and real -time monitoring of life cycle management technology.
Main advantages of garbage handling grab overhead cranes
Speed regulation range: Due to the characteristics of garbage handling and the requirements for improving efficiency, the overhead crane system's speed regulation requirements are very large. This waste handling crane has a level multi -transmission speed regulation and stepless speed regulation option.
Running smoothly: Use the torque output of optimized motor to effectively control the acceleration and deceleration of driving to avoid grasping.
Multiple control methods and instruction methods: There are V/F control, vector opening or vector closed -loop control. In special circumstances, we have a variety of instruction methods to choose from, including potential rods, 2-4 main order consoles, 0 ~ 10V or 4 ~ 20mA analog signals.
Convenient switch between hand and automatic operation: After simple settings, the overhead crane system can run in automatic state, providing automatic feeding, inverted stacks, and weighing weights. At the same time, it can provide self -protection. At the same time, as long Except for data settings), you can return to the manual state to ensure safety. A. Automatic feed -B. Automatic inverted stack -C. Comprehensive monitoring and various reliable and effective protection measures (the crane electrical control system uses advanced "touch screen+PLC+frequency conversion speed adjustment" control solutions at home and abroad)
Full Automatic & Semi Automatic Waste handlging Cranes
Garbage handling grab overhead crane is a critical device in the garbage feed system of various types of garbage-cremation power plants in modern cities. It is located at the top of the garbage storing pit and is primarily used for garbage feeding, conveying, mixing, fetching, and weighting operations. Our garbage grab overhead crane can strictly implement lifting and conveying to ensure the normal operation of the garbage cremation power plant. The crane can be operated manually, semi-automatically, or automatically.
Each time the waste handling crane covers a predefined position, either forward or backward, it scans and updates height data on each position.
PLC compares the obtained data and records the shortest height recorded.
The coordinates for the automatism (x, y, and h) are obtained by knowing that each data / position is assigned to specific long travel and cross travelling coordinates.
The equipment's components are mature and dependable products that have been in use for decades. The design includes a sufficient load margin to ensure safe and reliable operation in working conditions. Our supporting electrical components are chosen after decades of safe use of similar products and hundreds of units. The type of practical experience accumulated is completely appropriate. The dump's environmental and operational conditions
Fully automatic waste treatment crane -In fully automatic mode, the garbage handling overhead crane can work simultaneously with each hopper or each bridge can feed two hoppers at the same time. These modes will be chosen from a set of checkpoints. When in automatic mode, the waste handling bridge crane will sweep and measure the undulations of the pit material before collecting it from the highest level into the hopper.
Semi-automatic waste treatment crane -In semi-automatic mode, the operator will operate the overhead crane to collect material, and once loaded, it will select the hopper (hoppers 1-2) to which the material will be sent. When the waste handling crane bridge is activated, it will rise to a pre-programmed height and simultaneously move the trolley and cart to the selected hopper mouth. The operator will open the paw as needed once it has been positioned. In semi-automatic mode, our products have the ability to control the position, dropping off, grabbing, and closing of the bucket manually.
Tailor-made semi automatic and full automatic garbage crane are available. Contact us.
Waste handling cranes for different uses and applications
Yuantai Crane's cranes are known for durability and reliability. For any industrial applications, these features belong to the very competitive edges. Much less for special cranes such as garbage cranes. The efficiency of the entire waste disposal process largely depends on these cranes, therefore they must have the best operating performance. We are not only paying attention to the safety of lifting equipment and lifting loads, but also striving to improve the safety performance around users' entire production systems.
Automatic Waste Handing Cranes
Lifting Capacity: 3.2t-10t
Span: 7.5m~25.5m
Working Class: A7,A8
Automatic garbage handling cranes are specific cranes used in power plants that burn waste. Based on customer requirements, the first intelligent identification technology in this sector chose the right automatic crane level with manual, semi-automatic, and fully automatic three control modes for free switch.
Slag Handling Cranes
Lifting Capacity: 5t~10t
Span: 7.5m~10.5m
Working Class: A7,A8
Ash is moved from the ash bunker to open containers or the dump vehicle using slag cranes with double-bladed grabs. Fully automatic operation is available around-the-clock.
Sludge Handling Cranes
Lifting Capacity: 5t-16t
Span: 7.5m~16.5m
Working Class: A7,A8
In the sludge station where the waste is burned, semi-fluid sludge is unloaded by trucks into storage bunkers. In the bunker, the sludge handling crane transfers the sludge into a storage area. From the storage area, the crane feeds the sludge to a process line.
Ash waste handling grab overhead crane
Coal slag handling grab bridge crane
European style grab overhead travelling crane
Sewage treatment crane
Wine residue handling grab bucket crane
Sluge handling gantry crane
How to get your custom waste handling overhead cranes ?
In order to get your custom waste handling overhead crane, the following information will help you to define the crane system that right for your applications and uses.
The garbage crane above the garbage storage pit of the waste incineration power plant: the function is to feed, transport, stir, fetch and weigh. The working duty is high, generally A6 or A7; the span is relatively large, generally about 15 meters; the lifting height is also high, generally about 20 meters; there is a closed operation room, using PLC control, full frequency conversion speed regulation, especially abroad Modern garbage disposal sites will adopt unattended intelligent control; they are equipped with 6-petal hydraulic grabs, which are more expensive, and their configurations are: electrical main components (Schneider); lifting (Wuxi Hongtai/Jiangxi Special); deceleration machine (hard tooth surface); brake (Jiaozuo Kejia); large and small car operating mechanism (SEM three-in-one); frequency conversion speed regulation (full vehicle ABB); "touch screen + PLC + frequency conversion speed regulation" control.
QDZ grab bridge cranes used for lifting ash in waste incineration power plants: After the waste is incinerated and discharged from the incinerator, the ash grab cranes used for loading and unloading these wastes are mostly ordinary grab cranes, and the working level is average. A5; The span and lifting height are also similar to the general ash shed, generally equipped with a two-petal or four-petal grab bucket.
QDZ type grab bridge crane used for lifting slag in steel mills, metal processing plants, etc.: same as the ash slag crane in the garbage dump. The catch of the ash hanger is generally two-petal or four-petal.
The main mechanisms frequently start and stop, reverse switch and change speed, and the work intensity is high. Note that the lower, left and right, front and rear common limit switches and limit limit switches must be set in its operating area.
The components of the grabs are not uniform, making it difficult to grab and lift. Different from other single materials grabbed by general-purpose grabs, municipal solid waste is composed of a mixture of different types of solid waste, which is unstable in nature, loose or agglomerated, and intertwined with soft and hard bonds, making it extremely difficult to grab and lift.
The lifting height and horizontal moving distance of the garbage grab crane are relatively large. According to the structure of the garbage incineration boiler, the garbage feeding port is generally set at a higher position, so that the garbage will slide down and loosen under its own gravity. Under normal circumstances, the bottom of the garbage storage pit is lower than minus 10m, the elevation of the feeding port is 20m or higher, and the actual lifting height of the garbage grab crane is greater than 30M; the horizontal movement distance is greater than or equal to the garbage incinerator feeding port platform and two The total length of the end access platform.
The working environment of the garbage grab crane is very harsh. Serious corrosion to equipment, has a great impact on the health of workers.
According to the type, shape, working condition, weight, and working duty, garbage cranes can be classified into broad and narrow senses. The garbage crane in the narrow sense refers to the QZ type A6/A7 bridge grab crane above the garbage storage pit of the waste incineration power plant;
The generalized garbage crane includes:
Slag water garbage crane for treating hotel slag water——explosion-proof single-girder grab crane (double hoist, A5)
Distiller's grains crane for processing distiller's grains in the distillery——explosion-proof single-beam grab crane (stainless steel grab bucket)
Steel slag cranes for steel mills, machining plants, and waste materials treatment
Hoisting equipment for slag water treatment in coal-fired power plants—(electric single-girder crane, double-girder bridge crane, gantry crane)
Water conservancy and reservoir garbage cleaning cranes, etc.
The bridge and gantry cranes involved in garbage disposal cranes mainly include:
LDZ electric single girder grab crane
LHZ type electric hoist double girder grab crane
QDZ Double Girder Overhead Grab Crane
QZ Garbage Double Girder Grab Crane
MHZ single girder grab bucket gantry crane
MGZ single girder grab bucket gantry crane
Yuantai Crane Factory has more than 30 years of manufacturing experience and is the top crane manufacturer and supplier in China. Here, we can provide you with the best quality and the most competitive price. we have over 30 years of experience engineering, manufacturing, and installing overhead crane systems. Yuatai Crane can provide overall services for all types of industries cranes, and the main services are as follow:
Crane project design Cranes designed by Yuatai Crane will solve any of your crane problems and material handling problems without spending any unnecessary expenditures.
Crane Installation EASAY installation, wonderful working performance. Yuatai Crane can provide on-site crane installation services and our crane engineers will be at your services when necessary.
Lifetime Maintenance Crane maintenance from Yuatai Crane ensures your safety and working efficiency.
Crane operator Training Yuatai Crane training includes crane operation, maintenance and inspection, and crane spare parts, etc.
Technical support The powerful technical support of Yuatai Crane will solve your crane technical problems.
Crane parts Yuatai Crane parts will renew your cranes.
5 ton to 32 ton overhead crane for sale. Custom grab bucket cranes for waste handling & energy recycling.Hot sale 5 ton, 10 ton, 20 ton, 32 ton eot crane.
Grab overhead crane for sludge handling. Customized double girder bridge crane with grab bucket for sludge handling in sewage treatment plants & others, etc.
Case study of a 60 ton overhead crane, customized European-style open winch, ideal for heavy industrial applications in Poland. Check production pictures.