Crane requirements for summer lifting operations
Summer is a season with relatively changeable weather. Just now it was still sunny and thunderstorms were coming soon, and the temperature was extremely high. So what aspects should be paid attention to in the operation of cranes in summer? The arrangement of Jiangsu cranes for summer lifting operations is as follows.
1. The person in charge of the project should do his homework in time and make adjustments to the work arrangements according to the changes in the weather.
2. If there is severe weather during the hoisting work, the outdoor work can be suspended and indoor work should be carried out first, for example, the work in the workshop such as equipment disassembly and installation should be organized first.
3. When the outdoor crane stops running, pay attention to check the parts and the safety status of the crane.
If you must operate it on a rainy day, pay attention to safety, especially when it rains, the line of sight will be affected. The first thing to do in rainy night hoisting is to do a good job of waterproofing, for example, use canopy to cover the equipment in the open air. If possible, don't work on rainy days.